Muninmax applies ASME Section VIII, Division 1 to the design and fabrication of pressure vessels.
Quality and Project Acceptance
Quality requirements and acceptance criteria are defined for each project. The proposal and agreement set out the deliverables, equipment connections and responsibilities.
Pressure Vessel Design and Fabrication
Welder Qualification Tests — March 2023
In March 2023, six Muninmax participants passed Welder Qualification Tests (WQT) conducted with PAE Technical Service.
- Two participants passed 6G tests.
- Four participants passed 3G tests.
Performance and Acceptance Criteria
Performance guarantees are agreed in writing for each project. They identify the guaranteed values, raw material and operating conditions, test methods and acceptance criteria.
Project Responsibilities
The project proposal and agreement define the work, deliverables, equipment connections and responsibilities. Included work, optional items, exclusions and acceptance criteria are agreed for the project.
Discuss Your Project Requirements
Contact Us
Address: 107/1 Moo 5, Wang Phong, Pran Buri, Prachuap Khiri Khan 77120, Thailand.
Tell us about your equipment, product and process requirements, including any acceptance criteria you already have. You can begin the discussion before the equipment model, technical specifications or required capacity have been determined.
